Hurricane Energy — Focus shifting to drilling ahead of EPS first oil

Hurricane Energy (LN: HUR)

Last close As at 22/04/2024

3.05

0.03 (0.99%)

Market capitalisation

61m

More on this equity

Research: Energy & Resources

Hurricane Energy — Focus shifting to drilling ahead of EPS first oil

With the Aoka Mizu FPSO now on station and hooked up at the Lancaster field, early production system (EPS) first oil remains on track for the end of H119. Hurricane (HUR) is currently focusing on topside commissioning prior to start up, which will be followed by a ramp-up period to a targeted gross plateau rate of 20kbd. In addition to progressing Lancaster, the company has a full programme of activity in its neighbouring Greater Warwick Area (GWA), with a three-well E&A programme expected to kick off in Q219 at Warwick Deep. This accelerated GWA programme is being made possible by Hurricane’s 2018 farm-out to Spirit Energy. Our risked valuation stands at 102.3p/share (from 102.8p/share) as we remove Edison’s 5% capex cost contingency, roll forward NAV and adjust our short-term oil price assumptions (long-term Brent remains $70/bbl).

Analyst avatar placeholder

Written by

Energy & Resources

Hurricane Energy

Focus shifting to drilling ahead of EPS first oil

Post-results update

Oil & gas

4 April 2019

Price

47p

Market cap

£912m

£0.77/US$

Net cash ($m) at 31 December 2018

99.5

Shares in issue

1,959.6m

Free float

75%

Code

HUR

Primary exchange

AIM

Secondary exchange

N/A

Share price performance

%

1m

3m

12m

Abs

3.0

3.6

43.6

Rel (local)

(0.2)

(5.5)

38.5

52-week high/low

60.0p

32.7p

Business description

Hurricane Energy is an E&P focused on fractured basement exploration and development in the West of Shetland region. The company’s 100%-owned Lancaster oil discovery (523mmbbl 2P reserves + 2C resources) is targeting first oil in H119.

Next events

Lancaster EPS first oil

H119

GWA drilling

Q219

Analysts

Sanjeev Bahl

+44 (0)20 3077 5742

Elaine Reynolds

+44 (0)20 3077 5713

Carlos Gomes

+44 (0)20 3077 5700

Hurricane Energy is a research client of Edison Investment Research Limited

With the Aoka Mizu FPSO now on station and hooked up at the Lancaster field, early production system (EPS) first oil remains on track for the end of H119. Hurricane (HUR) is currently focusing on topside commissioning prior to start up, which will be followed by a ramp-up period to a targeted gross plateau rate of 20kbd. In addition to progressing Lancaster, the company has a full programme of activity in its neighbouring Greater Warwick Area (GWA), with a three-well E&A programme expected to kick off in Q219 at Warwick Deep. This accelerated GWA programme is being made possible by Hurricane’s 2018 farm-out to Spirit Energy. Our risked valuation stands at 102.3p/share (from 102.8p/share) as we remove Edison’s 5% capex cost contingency, roll forward NAV and adjust our short-term oil price assumptions (long-term Brent remains $70/bbl).

Year-end

Revenue
($m)

EBITDA
($m)

Operating cash flow ($m)

Capex*
($m)

Net cash/
(debt) ($m)

12/17

0.0

(14.6)

(8.1)

(265.7)

133.5

12/18

0.0

(12.6)

(4.4)

(209.9)

(103.4)

12/19e

109.4

24.2

3.1

(2.6)

(102.9)

12/20e

345.8

209.3

188.2

(52.5)

32.8

Note: *Capex is net of carried investment by Spirit Energy.

Lancaster EPS expectations

With the Aoka Mizu FPSO now successfully hooked up to the buoy, the focus shifts to commissioning, production performance and data gathering. Management guides at improving operational efficiency over the first six months of operation prior to stabilised production of 17kbd (net of operational downtime). We believe a minimum six- to 12-month period of data gathering will be required to begin to evaluate the long-term producibility of the reservoir.

Warwick Deep: Data input for 2020 programme

The Transocean Leader semi-sub is expected to begin the three-well GWA drilling programme with the Warwick Deep exploration well, 205/26b-C. This well is designed to be drilled below structural closure and to prove deep oil and will also provide key data for the planning of the 2020 GWA appraisal programme. Next to be drilled will be the Lincoln appraisal well. One of the three GWA wells is expected to be tied back to the Aoka Mizu in 2020 for long-term testing.

Valuation: Removing EPS capex contingency

Changes to our valuation are driven by the removal of EPS capex contingency (5%), rolling forward our NAV and a fall in short-term Brent price expectations, which are based on EIA forecasts. Our long-term (2022 onwards) Brent expectations remain at $70/bbl. Brent for FY19 falls from $73.7/bbl to $62.8/bbl and for FY20 from $71.9/bbl to $62/bbl. Our risked valuation is currently 102.3p/share; changes to our short-term financial forecasts are highlighted within this note.

EPS expectations: Commissioning and beyond

In the following section, we take a look at Edison’s expectations for the Lancaster EPS now that the Aoka Mizu FPSO is on location and hooked-up to the turret mooring system buoy. Subsea umbilicals, risers and flowlines (SURF) were connected to the buoy in H218, and a flow path now exists from both the 205/21a-6 and 205/21a-7z wells to the FPSO. The Aoka Mizu will now be commissioned ahead of first oil, which we believe remains on track for the back end of H119. Below we look at expectations for the Lancaster EPS development phase; these include:

Commissioning

First oil and production ramp-up

Flow assurance

Initial well productivity

EPS data gathering

Production ramp-up to 40kbd gross

Commissioning: From hook-up to first oil

Post hook-up, the Aoka Mizu will undergo a period of commissioning during which the FPSO topsides are prepared for the introduction of hydrocarbons. Commissioning is typically a labour-intensive process involving instrumentation checks, final machinery alignment, operational tests on rotating equipment and testing of safety critical systems ahead of introducing process fluids. In the case of a subsea tie-back this would typically be followed by the displacement of liquids within sub-sea flowlines, well clean-up, and introduction of hydrocarbons into the production facilities. The duration of an FPSO commissioning process can vary significantly and is often driven by the efficacy of final acceptance checks. The Aoka Mizu has been extensively tested and pre-commissioned both in dry-dock and offshore, mitigating the risk of major delays. Additionally, the vessel being a retro-fit of a previously operational FPSO rather than a newbuild or conversion provides additional assurances of the operational readiness of the vessel.

Looking at other North Sea FPSO developments there is a wide range of time durations from hook-up to first oil. The length of this interval can be driven by numerous factors including facility specific issues, size/complexity of the development and consideration of flow assurance issues, among others. Recent North Sea FPSO developments include the Premier Oil-operated Catcher FPSO, which achieved first oil just over nine weeks after the vessel was hooked up in 2017; it then took five months to reach plateau production. The EnQuest-operated Alma/Galia FPSO took five and a half months to first oil, reaching full-rate production five months later. EnQuest’s Kraken, albeit a much more complex development targeting 40kboed from 23 wells, took just 14 weeks from hook up to first oil, but incurred uptime issues during the vessel’s first few months of operation. As it stands, we remain comfortable in our estimate of first oil at the end of H119, but delays cannot be completely ruled out.

First oil, production ramp-up and uptime

We believe there is uncertainty around production expectations, at least during the first six months of EPS operation. Historical well test data provide some comfort of initial well delivery during the first six months of operation and operational efficiency assumptions are likely to be driven by vessel uptime rather than Hurricane choking back producing wells. Immediately following commissioning, Hurricane is targeting an initial gross production rate of 20kbd, estimating operating efficiency to be c 45% for the first three months and then 65% for the second three months of production before reaching a stabilised level of 85%, which includes downtime for pigging runs. This implies plateau production of 17kbd net of operating efficiency. Edison has not altered its EPS ramp-up production profile, which is broadly in line with Hurricane guidance and assumes late H119 start-up.

Exhibit 1: Lancaster EPS production ramp-up expectations

Exhibit 2: Buoy in position

Source: Edison Investment Research

Source: Hurricane Energy

Exhibit 1: Lancaster EPS production ramp-up expectations

Source: Edison Investment Research

Exhibit 2: Buoy in position

Source: Hurricane Energy

Flow assurance a key uptime consideration

Our understanding is that Lancaster crude has a 38°C wax appearance temperature, which is approximately 20°C lower than reservoir temperature. Wax management is therefore a key consideration for the project’s subsea and facility process engineers. The current wax management philosophy uses a combination of several components:

High U-value (insulation) flowlines.

Ability to inject wax suppressant/dissolver chemicals at the wellhead.

Ability to displace crude from flowlines for extended shutdowns.

Procedure to run a pig through a pigging loop (both flowlines) every two weeks. This involves a production shut-down for a short period and is reflected in Hurricane’s 85% vessel uptime assumption.

Crude inlet pre-heating.

During the first few months post first-oil Hurricane is likely to fine-tune production parameters and wax management philosophy. This would typically involve working within a production envelope and a floor in flow rate set by the need to sustain a sufficient oil rate in the subsea flowlines to avoid wax appearance (c 6kbd per flowline for Lancaster).

Confidence in initial well productivity

Hurricane is confident in EPS productivity given the low draw-down required to produce at 20kbd gross given the high calculated productivity index for both producers. This is based on 2014/2016 flow tests, which achieved constrained rates of 9.8kbd (205/21a-6) and 15.4kbd (205/21a-7z), respectively. Management does not see water breakthrough as a major risk with the existing producer pair, which is located in a crestal location c 430m from the known oil water contact. The EPS phase is targeting just 12% of Lancaster 2P reserves and 2C resources, and assuming this entire volume is connected, we believe pressure depletion during the EPS phase is likely to be limited. Assuming flow assurance is suitably addressed we expect initial well productivity to be in line with management expectations; the ability to maintain plateau production rates will then be determined by bottom hole pressure response – Hurricane currently models three cases as shown in Exhibit 4. We currently base our modelling around Hurricane’s mid-case.

Exhibit 3: IPR plot (205/21a-6 well)

Exhibit 4: Lancaster EPS BHP cases

Source: Hurricane Energy

Source: Hurricane Energy

Exhibit 3: IPR plot (205/21a-6 well)

Source: Hurricane Energy

Exhibit 4: Lancaster EPS BHP cases

Source: Hurricane Energy

EPS data gathering

Once EPS production has stabilised, Hurricane’s focus is likely to shift to data gathering in order to enhance reservoir understanding. Hurricane expects that it will need at least six to 12 months of data from the two producing wells, 205/21a-6 and 205/21a-7z, in order to verify current modelling assumptions. Successful confirmation of basement modelling parameters will aid in the de-risking of Greater Lancaster Area (GLA) full field development. We believe Hurricane should be able to determine if downhole pressure data matches its low, base or high case models and interference testing between the two wells will also assist in assessing variations in reservoir horizontal and vertical permeabilities. These data will greatly assist in refining basement reservoir management practices. Finally, pressure build-up data will provide information on the reservoir further away from the wellbore. Although the initial EPS producers are located at a crestal location and high relative to oil water contact (OWC), pressure data should help provide some indication of interaction between oil and water within fractured basement. We believe a deeper well closer to the OWC might be required in order to provide greater understanding of water coning and channelling mechanisms. The Warwick Deep well to be drilled in 2019 on the GWA rather than GLA, is a deeper well outside of local structural closure which will be flow tested.

Aoka Mizu ramp-up to 40kbd gross

Hurricane Energy is looking at increasing Aoka Mizu FPSO output to c 40kbd, through new well additions (GLA and GWA) and de-bottlenecking. We see a gas export solution as a key enabler of further production enhancement, as incremental production is currently capped under existing flaring restrictions.

Gas export solutions

Hurricane has studied numerous gas evacuation solutions and appears to be progressing the opportunity to tie-in the Lancaster EPS to the BP-operated West of Shetlands pipeline systems (WOSPS). The WOSPS was installed in 2002 to transport surplus gas from the Foinaven and Schiehallion fields (Quad 204) to the Magnus field in the northern North Sea. Pipeline operator BP currently indicates WOSPS available capacity in excess of 25% (of total capacity of 175mmscfd) through to 2023.

The capital cost of tie-in to WOSPS is uncertain at this point, but we estimate that this will require gas export compression to be added to the Aoka Mizu FPSO, a 10–20km flowline to WOSPS and associated sub-sea equipment to the enable tie-in to the WOSPS PLEM (pipeline end manifold). Hurricane currently estimates a gross cost of $187.5m for the SURF, well completion, FPSO modifications and WOSPS tie-in for a GWA well (phase II costs); Hurricane’s 50% equity interest would be c 50% carried under existing agreements. Hurricane Energy is also fully carried for its share of long-lead items and engineering work for the 2020 installation of the WOSPS tie-in (included within phase I of the GWA farm-in agreement).

Exhibit 5: Regional activity and WOSPS routing

Source: Hurricane Energy

De-bottlenecking

The combination of wells 205/21a-6 and 205/21a-7z have the potential to deliver significantly in excess of 20kbd gross, on an unrestricted basis based on historical constrained well test data. After initial data gathering is complete there is potential to increase production from the two wells assuming basement modelling supports the view that higher draw-down would not negatively affect ultimate oil recovery. While we have not modelled de-bottlenecking potential in our base case valuation, indicatively this could add c 5-8% to our 102.3p/share valuation. We expect to include de-bottlenecking potential once EPS stabilised production has been achieved and Hurricane has authority to export gas through the WOSPS.

GWA tie-back

10kbd of Aoka Mizu processing capacity has been dedicated to a GWA tie-back as part of the Spring Energy farm-in. We currently include a single GWA tie-back in our valuation on a risked basis. Additional options to increase production include the addition of a third GLA tie-back.

Exhibit 6: Modelled base case net production profile (unrisked)*

Source: Edison Investment Research. Note: *GWA tie-back volumes reflect gross 7.5kbd (after operational uptime) at 50% Hurricane interest. Excludes de-bottlenecking potential.

2019 an active year for exploration

Warwick Deep: First well in GWA accelerated programme

Activity has been accelerated in the Greater Warwick Area (GWA, covering Warwick and Lincoln), as a result of Hurricane’s farm-out to Spirit Energy in September 2018 and the project is targeting a 500mmboe FFD sanction in 2021. The first phase of activity in this programme is due to commence in Q219 with the drilling of three horizontal wells: two exploration wells in Warwick and an appraisal well in Lincoln.

Exhibit 7: GWA work programme

Source: Hurricane Energy

Each of the 1km horizontal wells will target a potentially separate fault compartment in order to assess if the large-scale faults act as pressure barriers. The wells will also be drilled at different depths to allow an oil pressure gradient to be defined from pressure data. All three wells will be suspended as future producers, if successful, with the Lincoln well, 205/26b-B, located to facilitate long-term testing via tie back to the Aoka Mizu.

Exhibit 8: GWA well locations map

Source: Hurricane Energy

The first well in the programme, Warwick Deep (205/26b-C), will be drilled below structural closure to a depth of 1,900m, and is designed to prove flow rates for deep oil. Data from this well will be an important input in the planning of the three-well appraisal programme scheduled in 2020. Warwick Deep will be followed by the Lincoln appraisal well. The third well in the programme, 205/26b-A, will be a crestal well drilled at the furthest step out from the Brynhild Fault Zone and Lancaster (~8km).

Exhibit 9: Schematic of proposed GWA well locations

Source: Hurricane Energy


Valuation

We are not making material changes to valuation ahead of EPS phase first oil, with RENAV little changed at 102.3p/share.

Moving parts in our modelling assumptions are highlighted below:

We remove a 5% capex contingency for the Lancaster EPS development.

Updated short-term oil price changes: our short-term Brent assumptions move from $72.8/bbl to $62.8/bbl in FY19, and from $73.7/bbl to $62.0/bbl in FY20, based on EIA forecasts as published in March 2019. Our long-term Brent forecast of $70/bbl from 2022 remains unchanged.

We update our forecasts to reflect reported FY18 results and EPS capex phasing.

Roll-forward of discount date to 1 January 2019.

Key valuation sensitivities include WACC, oil price and, to a lesser extent, opex and capex assumptions. FFD development capex is assumed to be carried under our modelled farm-out scenario.

Exhibit 10: Hurricane risked valuation sensitivities

Exhibit 11: RENAV waterfall

Source: Edison Investment Research

Source: Edison Investment Research

Exhibit 10: Hurricane risked valuation sensitivities

Source: Edison Investment Research

Exhibit 11: RENAV waterfall

Source: Edison Investment Research

Financials

Short-term financial forecasts will be driven by timing and initial performance of the Lancaster EPS and as such there will be significant uncertainty in precise forecast of revenues and cash flows for FY19. We expect FY20 to be more reflective of the stabilised cash generation potential of the EPS development phase; the changes highlighted below are largely to our lower short-term oil price expectations.

Exhibit 12: Changes to short-term forecasts

New

Old

Change (%)

2019e

2020e

2019e

2020e

2019

2020

Production (kbd)

5.0

16.0

5.0

16.0

0%

0%

Brent ($/bbl)

62.8

62.0

72.8

73.7

-16%

-19%

Revenue ($m)

109.4

345.8

128.4

396.4

-17%

-15%

EBITDA ($m)

24.2

209.3

43.2

260.0

-78%

-24%

CFO (post interest and cash tax) ($m)

3.1

188.2

28.6

245.3

-832%

-30%

Source: Edison Investment Research

Below we look at a cash flow bridge, which highlights Hurricane’s potential to fund capital commitments through to end 2021 from a combination of existing cash resources, cash flow from EPS operations, and existing cost-carry arrangements.

We assume conversion of Hurricane’s outstanding 2022 convertible bond ($230m) in our RENAV. If management chooses to refinance this debt instrument in 2022, we believe management will have numerous options including securing debt against the Lancaster EPS through an RBL debt instrument, a new convertible loan or a short-duration corporate bond.

Exhibit 13: FY19 to FY21 cash flow bridge*

Source: Edison Investment Research. Note: *Outstanding convertible bond of $230m due in 2022 if not redeemed prior to maturity.

Exhibit 14: Financial summary

 

 

$m

2017

2018

2019e

2020e

2021e

Year end 31 December

 

 

 

IFRS

IFRS

IFRS

IFRS

IFRS

PROFIT & LOSS

Revenue

 

 

 

0.0

0.0

109.4

345.8

476.8

Operating Expenses

(14.6)

(12.7)

(109.8)

(215.0)

(244.2)

EBITDA

 

 

 

(14.6)

(12.6)

24.2

209.3

326.3

Operating Profit (before amort. and except.)

 

 

(14.6)

(12.7)

(0.4)

130.8

232.6

Exploration expenses

(10.4)

0.0

0.0

0.0

0.0

Exceptionals

10.4

(42.4)

0.0

0.0

0.0

Other

0.0

0.0

0.0

0.0

0.0

Operating Profit

(14.6)

(55.0)

(0.4)

130.8

232.6

Net Interest

7.6

(5.9)

(21.1)

(21.2)

(21.1)

Profit Before Tax (norm)

 

 

 

(7.0)

(18.5)

(21.5)

109.6

211.4

Profit Before Tax (FRS 3)

 

 

 

(7.0)

(60.9)

(21.5)

109.6

211.4

Tax

0.0

0.0

0.0

0.0

(10.6)

Profit After Tax (norm)

(7.0)

(18.5)

(21.5)

109.6

200.8

Profit After Tax (FRS 3)

(7.0)

(60.9)

(21.5)

109.6

200.8

Average Number of Shares Outstanding (m)

1,583.8

1,959.6

1,959.6

1,959.6

1,959.6

EPS - normalised (c)

 

 

 

(0.4)

(0.9)

(1.1)

5.6

10.2

EPS - normalised and fully diluted (c)

 

 

(0.4)

(2.2)

(2.5)

12.9

23.7

EPS - (IFRS) (c)

 

 

 

(0.4)

(3.1)

(1.1)

5.6

10.2

Gross Margin (%)

N/A

N/A

N/A

37.8

48.8

EBITDA Margin (%)

N/A

N/A

22.1

60.5

68.4

Operating Margin (before GW and except.) (%)

N/A

N/A

N/A

37.8

48.8

BALANCE SHEET

Fixed Assets

 

 

 

587.9

884.2

837.9

811.9

1,009.6

Intangible Assets

126.4

131.5

131.5

131.5

131.5

Tangible Assets

445.3

728.2

706.2

680.2

877.9

Investments

16.3

24.5

0.2

0.2

0.2

Current Assets

 

 

 

350.1

106.0

130.8

266.4

269.5

Stocks

1.4

4.6

4.6

4.6

4.6

Debtors

4.7

2.6

2.6

2.6

2.6

Cash

343.9

98.9

123.6

259.3

262.4

Other

0.0

0.0

0.0

0.0

0.0

Current Liabilities

 

 

 

(28.8)

(55.1)

(55.1)

(55.1)

(55.1)

Creditors

(28.8)

(55.1)

(55.1)

(55.1)

(55.1)

Short term borrowings

0.0

0.0

0.0

0.0

0.0

Long Term Liabilities

 

 

 

(226.7)

(307.0)

(307.0)

(307.0)

(307.0)

Long term borrowings

(191.1)

(198.4)

(198.4)

(198.4)

(198.4)

Other long term liabilities

(35.6)

(108.7)

(108.7)

(108.7)

(108.7)

Net Assets

 

 

 

682.5

628.1

606.6

716.2

917.0

CASH FLOW

Operating Cash Flow

 

 

 

(8.1)

(4.4)

3.1

188.2

294.5

Cash tax paid

0.0

0.0

0.0

0.0

0.0

Capex

(265.7)

(209.9)

(2.6)

(52.5)

(291.5)

Acquisitions/disposals

0.0

0.0

0.0

0.0

0.0

Financing

301.2

(17.2)

0.0

0.0

0.0

Dividends

0.0

0.0

0.0

0.0

0.0

Net Cash Flow

27.4

(231.5)

0.5

135.7

3.1

Opening net debt/(cash)

 

 

 

(98.1)

(133.5)

103.4

102.9

(32.8)

HP finance leases initiated

0.0

0.0

0.0

0.0

0.0

Other

8.0

(5.3)

0.0

0.0

0.0

Closing net debt/(cash)

 

 

 

(133.5)

103.4

102.9

(32.8)

(35.8)

Source: Hurricane Energy accounts, Edison Investment Research

General disclaimer and copyright

This report has been commissioned by Hurricane Energy and prepared and issued by Edison, in consideration of a fee payable by Hurricane Energy. Edison Investment Research standard fees are £49,500 pa for the production and broad dissemination of a detailed note (Outlook) following by regular (typically quarterly) update notes. Fees are paid upfront in cash without recourse. Edison may seek additional fees for the provision of roadshows and related IR services for the client but does not get remunerated for any investment banking services. We never take payment in stock, options or warrants for any of our services.

Accuracy of content: All information used in the publication of this report has been compiled from publicly available sources that are believed to be reliable, however we do not guarantee the accuracy or completeness of this report and have not sought for this information to be independently verified. Opinions contained in this report represent those of the Edison analyst at the time of publication. Forward-looking information or statements in this report contain information that is based on assumptions, forecasts of future results, estimates of amounts not yet determinable, and therefore involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of their subject matter to be materially different from current expectations.

Exclusion of Liability: To the fullest extent allowed by law, Edison shall not be liable for any direct, indirect or consequential losses, loss of profits, damages, costs or expenses incurred or suffered by you arising out or in connection with the access to, use of or reliance on any information contained on this note.

No personalised advice: The information that we provide should not be construed in any manner whatsoever as, personalised advice. Also, the information provided by us should not be construed by any subscriber or prospective subscriber as Edison’s solicitation to effect, or attempt to effect, any transaction in a security. The securities described in the report may not be eligible for sale in all jurisdictions or to certain categories of investors.

Investment in securities mentioned: Edison has a restrictive policy relating to personal dealing and conflicts of interest. Edison Group does not conduct any investment business and, accordingly, does not itself hold any positions in the securities mentioned in this report. However, the respective directors, officers, employees and contractors of Edison may have a position in any or related securities mentioned in this report, subject to Edison's policies on personal dealing and conflicts of interest.

Copyright: Copyright 2019 Edison Investment Research Limited (Edison). All rights reserved FTSE International Limited (“FTSE”) © FTSE 2019. “FTSE®” is a trade mark of the London Stock Exchange Group companies and is used by FTSE International Limited under license. All rights in the FTSE indices and/or FTSE ratings vest in FTSE and/or its licensors. Neither FTSE nor its licensors accept any liability for any errors or omissions in the FTSE indices and/or FTSE ratings or underlying data. No further distribution of FTSE Data is permitted without FTSE’s express written consent.

Australia

Edison Investment Research Pty Ltd (Edison AU) is the Australian subsidiary of Edison. Edison AU is a Corporate Authorised Representative (1252501) of Myonlineadvisers Pty Ltd who holds an Australian Financial Services Licence (Number: 427484). This research is issued in Australia by Edison AU and any access to it, is intended only for "wholesale clients" within the meaning of the Corporations Act 2001 of Australia. Any advice given by Edison AU is general advice only and does not take into account your personal circumstances, needs or objectives. You should, before acting on this advice, consider the appropriateness of the advice, having regard to your objectives, financial situation and needs. If our advice relates to the acquisition, or possible acquisition, of a particular financial product you should read any relevant Product Disclosure Statement or like instrument.

New Zealand

The research in this document is intended for New Zealand resident professional financial advisers or brokers (for use in their roles as financial advisers or brokers) and habitual investors who are “wholesale clients” for the purpose of the Financial Advisers Act 2008 (FAA) (as described in sections 5(c) (1)(a), (b) and (c) of the FAA). This is not a solicitation or inducement to buy, sell, subscribe, or underwrite any securities mentioned or in the topic of this document. For the purpose of the FAA, the content of this report is of a general nature, is intended as a source of general information only and is not intended to constitute a recommendation or opinion in relation to acquiring or disposing (including refraining from acquiring or disposing) of securities. The distribution of this document is not a “personalised service” and, to the extent that it contains any financial advice, is intended only as a “class service” provided by Edison within the meaning of the FAA (i.e. without taking into account the particular financial situation or goals of any person). As such, it should not be relied upon in making an investment decision.

United Kingdom

Neither this document and associated email (together, the "Communication") constitutes or form part of any offer for sale or subscription of, or solicitation of any offer to buy or subscribe for, any securities, nor shall it or any part of it form the basis of, or be relied on in connection with, any contract or commitment whatsoever. Any decision to purchase shares in the Company in the proposed placing should be made solely on the basis of the information to be contained in the admission document to be published in connection therewith.

This Communication is being distributed in the United Kingdom and is directed only at (i) persons having professional experience in matters relating to investments, i.e. investment professionals within the meaning of Article 19(5) of the Financial Services and Markets Act 2000 (Financial Promotion) Order 2005, as amended (the "FPO") (ii) high net-worth companies, unincorporated associations or other bodies within the meaning of Article 49 of the FPO and (iii) persons to whom it is otherwise lawful to distribute it. The investment or investment activity to which this document relates is available only to such persons. It is not intended that this document be distributed or passed on, directly or indirectly, to any other class of persons and in any event and under no circumstances should persons of any other description rely on or act upon the contents of this document (nor will such persons be able to purchase shares in the placing).

This Communication is being supplied to you solely for your information and may not be reproduced by, further distributed to or published in whole or in part by, any other person.

United States

The Investment Research is a publication distributed in the United States by Edison Investment Research, Inc. Edison Investment Research, Inc. is registered as an investment adviser with the Securities and Exchange Commission. Edison relies upon the "publishers' exclusion" from the definition of investment adviser under Section 202(a) (11) of the Investment Advisers Act of 1940 and corresponding state securities laws. This report is a bona fide publication of general and regular circulation offering impersonal investment-related advice, not tailored to a specific investment portfolio or the needs of current and/or prospective subscribers. As such, Edison does not offer or provide personal advice and the research provided is for informational purposes only. No mention of a particular security in this report constitutes a recommendation to buy, sell or hold that or any security, or that any particular security, portfolio of securities, transaction or investment strategy is suitable for any specific person.

Frankfurt +49 (0)69 78 8076 960

Schumannstrasse 34b

60325 Frankfurt

Germany

London +44 (0)20 3077 5700

280 High Holborn

London, WC1V 7EE

United Kingdom

New York +1 646 653 7026

1,185 Avenue of the Americas

3rd Floor, New York, NY 10036

United States of America

Sydney +61 (0)2 8249 8342

Level 4, Office 1205

95 Pitt Street, Sydney

NSW 2000, Australia

Frankfurt +49 (0)69 78 8076 960

Schumannstrasse 34b

60325 Frankfurt

Germany

London +44 (0)20 3077 5700

280 High Holborn

London, WC1V 7EE

United Kingdom

New York +1 646 653 7026

1,185 Avenue of the Americas

3rd Floor, New York, NY 10036

United States of America

Sydney +61 (0)2 8249 8342

Level 4, Office 1205

95 Pitt Street, Sydney

NSW 2000, Australia

General disclaimer and copyright

This report has been commissioned by Hurricane Energy and prepared and issued by Edison, in consideration of a fee payable by Hurricane Energy. Edison Investment Research standard fees are £49,500 pa for the production and broad dissemination of a detailed note (Outlook) following by regular (typically quarterly) update notes. Fees are paid upfront in cash without recourse. Edison may seek additional fees for the provision of roadshows and related IR services for the client but does not get remunerated for any investment banking services. We never take payment in stock, options or warrants for any of our services.

Accuracy of content: All information used in the publication of this report has been compiled from publicly available sources that are believed to be reliable, however we do not guarantee the accuracy or completeness of this report and have not sought for this information to be independently verified. Opinions contained in this report represent those of the Edison analyst at the time of publication. Forward-looking information or statements in this report contain information that is based on assumptions, forecasts of future results, estimates of amounts not yet determinable, and therefore involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of their subject matter to be materially different from current expectations.

Exclusion of Liability: To the fullest extent allowed by law, Edison shall not be liable for any direct, indirect or consequential losses, loss of profits, damages, costs or expenses incurred or suffered by you arising out or in connection with the access to, use of or reliance on any information contained on this note.

No personalised advice: The information that we provide should not be construed in any manner whatsoever as, personalised advice. Also, the information provided by us should not be construed by any subscriber or prospective subscriber as Edison’s solicitation to effect, or attempt to effect, any transaction in a security. The securities described in the report may not be eligible for sale in all jurisdictions or to certain categories of investors.

Investment in securities mentioned: Edison has a restrictive policy relating to personal dealing and conflicts of interest. Edison Group does not conduct any investment business and, accordingly, does not itself hold any positions in the securities mentioned in this report. However, the respective directors, officers, employees and contractors of Edison may have a position in any or related securities mentioned in this report, subject to Edison's policies on personal dealing and conflicts of interest.

Copyright: Copyright 2019 Edison Investment Research Limited (Edison). All rights reserved FTSE International Limited (“FTSE”) © FTSE 2019. “FTSE®” is a trade mark of the London Stock Exchange Group companies and is used by FTSE International Limited under license. All rights in the FTSE indices and/or FTSE ratings vest in FTSE and/or its licensors. Neither FTSE nor its licensors accept any liability for any errors or omissions in the FTSE indices and/or FTSE ratings or underlying data. No further distribution of FTSE Data is permitted without FTSE’s express written consent.

Australia

Edison Investment Research Pty Ltd (Edison AU) is the Australian subsidiary of Edison. Edison AU is a Corporate Authorised Representative (1252501) of Myonlineadvisers Pty Ltd who holds an Australian Financial Services Licence (Number: 427484). This research is issued in Australia by Edison AU and any access to it, is intended only for "wholesale clients" within the meaning of the Corporations Act 2001 of Australia. Any advice given by Edison AU is general advice only and does not take into account your personal circumstances, needs or objectives. You should, before acting on this advice, consider the appropriateness of the advice, having regard to your objectives, financial situation and needs. If our advice relates to the acquisition, or possible acquisition, of a particular financial product you should read any relevant Product Disclosure Statement or like instrument.

New Zealand

The research in this document is intended for New Zealand resident professional financial advisers or brokers (for use in their roles as financial advisers or brokers) and habitual investors who are “wholesale clients” for the purpose of the Financial Advisers Act 2008 (FAA) (as described in sections 5(c) (1)(a), (b) and (c) of the FAA). This is not a solicitation or inducement to buy, sell, subscribe, or underwrite any securities mentioned or in the topic of this document. For the purpose of the FAA, the content of this report is of a general nature, is intended as a source of general information only and is not intended to constitute a recommendation or opinion in relation to acquiring or disposing (including refraining from acquiring or disposing) of securities. The distribution of this document is not a “personalised service” and, to the extent that it contains any financial advice, is intended only as a “class service” provided by Edison within the meaning of the FAA (i.e. without taking into account the particular financial situation or goals of any person). As such, it should not be relied upon in making an investment decision.

United Kingdom

Neither this document and associated email (together, the "Communication") constitutes or form part of any offer for sale or subscription of, or solicitation of any offer to buy or subscribe for, any securities, nor shall it or any part of it form the basis of, or be relied on in connection with, any contract or commitment whatsoever. Any decision to purchase shares in the Company in the proposed placing should be made solely on the basis of the information to be contained in the admission document to be published in connection therewith.

This Communication is being distributed in the United Kingdom and is directed only at (i) persons having professional experience in matters relating to investments, i.e. investment professionals within the meaning of Article 19(5) of the Financial Services and Markets Act 2000 (Financial Promotion) Order 2005, as amended (the "FPO") (ii) high net-worth companies, unincorporated associations or other bodies within the meaning of Article 49 of the FPO and (iii) persons to whom it is otherwise lawful to distribute it. The investment or investment activity to which this document relates is available only to such persons. It is not intended that this document be distributed or passed on, directly or indirectly, to any other class of persons and in any event and under no circumstances should persons of any other description rely on or act upon the contents of this document (nor will such persons be able to purchase shares in the placing).

This Communication is being supplied to you solely for your information and may not be reproduced by, further distributed to or published in whole or in part by, any other person.

United States

The Investment Research is a publication distributed in the United States by Edison Investment Research, Inc. Edison Investment Research, Inc. is registered as an investment adviser with the Securities and Exchange Commission. Edison relies upon the "publishers' exclusion" from the definition of investment adviser under Section 202(a) (11) of the Investment Advisers Act of 1940 and corresponding state securities laws. This report is a bona fide publication of general and regular circulation offering impersonal investment-related advice, not tailored to a specific investment portfolio or the needs of current and/or prospective subscribers. As such, Edison does not offer or provide personal advice and the research provided is for informational purposes only. No mention of a particular security in this report constitutes a recommendation to buy, sell or hold that or any security, or that any particular security, portfolio of securities, transaction or investment strategy is suitable for any specific person.

Frankfurt +49 (0)69 78 8076 960

Schumannstrasse 34b

60325 Frankfurt

Germany

London +44 (0)20 3077 5700

280 High Holborn

London, WC1V 7EE

United Kingdom

New York +1 646 653 7026

1,185 Avenue of the Americas

3rd Floor, New York, NY 10036

United States of America

Sydney +61 (0)2 8249 8342

Level 4, Office 1205

95 Pitt Street, Sydney

NSW 2000, Australia

Frankfurt +49 (0)69 78 8076 960

Schumannstrasse 34b

60325 Frankfurt

Germany

London +44 (0)20 3077 5700

280 High Holborn

London, WC1V 7EE

United Kingdom

New York +1 646 653 7026

1,185 Avenue of the Americas

3rd Floor, New York, NY 10036

United States of America

Sydney +61 (0)2 8249 8342

Level 4, Office 1205

95 Pitt Street, Sydney

NSW 2000, Australia

More on Hurricane Energy

View All

Latest from the Energy & Resources sector

View All Energy & Resources content

Energy & Resources

ABO Wind: EKF 2023 QuickView

Energy & Resources

Canacol Energy — 2022 ESG report highlights new goals

Energy & Resources

Canacol Energy — Q2 results in line

Energy & Resources

Canacol Energy — Increasing activity

Entertainment One — Good year all round

Entertainment One’s (eOne) year-end trading update indicates financial performance in line with expectations, with the groundwork in place for good progress across both Family & Brands and Film, Television & Music. The benefits of the transition towards production in film are clear, with better margin potential, a reduced risk profile and stronger free cash flow. Our EBITDA and EPS forecasts are unchanged and we have introduced numbers for FY21e, showing continuing progress. The intense competition between new and competing SVOD providers is driving a very healthy appetite for high-quality entertainment content.

Continue Reading

Subscribe to Edison

Get access to the very latest content matched to your personal investment style.

Sign up for free